Higher efficiency reduces the need for extra panels. A 500 MW farm saved 50 acres by avoiding panel expansion.
Higher efficiency reduces the need for extra panels. A 500 MW farm saved 50 acres by avoiding panel expansion.
Complies with manufacturers like Renew Power and Vikram Solar. No warranty voidances reported since 2018.
TAYPRO serves 5,000+ MW across India, including Adani’s 2 GW Kamuthi plant (Tamil Nadu), Tata’s 250 MW facility (Rajasthan), and 500+ rooftop setups in Delhi-NCR. Expanding to Africa and the Middle East in 2025.
Yes. APIs sync robot data (cleaning cycles, efficiency metrics) with SCADA in <48 hours. At Adani Solar’s plant, this integration reduced manual reporting by 80%.
TAYPRO guarantees 98% uptime via RF mesh networks and same-day repairs. A Gujarat plant reported 99.2% uptime in 2023.
Yes. Low-power mode (10% energy use) allows overnight cleaning in deserts like Rajasthan, avoiding daytime heat (55°C+).
© Copyright 2025 – TAYPRO PRIVATE LIMITED. All Rights Reserved.