Revenue leak
8–25%
Generation lost to soiling and component drift
Dust films, tracker stalls, and inverter clipping stack on the same MW-year. Industry studies in arid belts report up to 25% annual loss even with periodic washing. SCADA shows the dip after the MWh is already gone.
